Kitchen diner – the builders week 3…

We have a floor!

The work pace has been a bit slower this week, but we do have a floor!

Insulation layer over the concrete
Insulation layer over the concrete
Top layer of screed
Top layer of screed

It was oh so tempting to press a hand or foot in the smooth layer of screed. We managed to resist the temptation and in 3 days it was ready to walk on.

We will have to wait about two months before it will be ready for us to lay our chosen floor finish. But seeing as we haven’t actually chosen our floor finish, two months should be fine!